Patio Leveling & Foundation
Contractor Reference Drawing — Backyard Landscaping Phase 2
43.5' x 14' Wrap-Around Patio | CMU Core + Stone Veneer Wall | 17.25" wall + 4" slab = 21.25" total | 45° Chamfered Corners
NOT TO SCALE
Plan View — Looking Down
X: 0 = Street Fence (left), 84 = Neighbor Wall (right) | Y: 0 = House (top), 63.5 = Back Fence (bottom)
← STREET (X=0)
NEIGHBOR (X=84) →
STREET FENCE (X=0)
HOUSE WALL (Y=0) — X=7.5 to X=66
7.5'
CONCRETE PATIO
43.5' x 14' — At House Level
4" slab on 3" gravel base (7" total)
A (~9')
B (~7')
C — FRONT WALL (~33.5') — 17.25" wall + 4" slab = 21.25"
D (~7')
E (~9')
STEPS
3 risers, ~6' wide
● = Recessed LED step lights (~6-8' o.c., mid-height on wall)
ADDITIONAL
LEVELED AREA
~33' x 16' — Sod
At yard level (-21.25")
X=51 to X=84
(neighbor property line)
3' HOUSE BORDER
F — BORDER WALL (~11.5')
A
A
43.5' (X=7.5 to X=51)
14' depth
~33' (X=51 to X=84)
LEVEL YARD — 21.25" below house level (starts at Y=14.6')
5' slope cut extends level yard from Y=19.6 to Y=14.6 across full 84' width
Section A-A — Wall Cross Section at Front Edge (Y=14')
CMU Core + Stone Veneer Retaining Wall with Cantilevered Slab Overhang
YARD LEVEL (0" REF)
PATIO SURFACE (+21.25")
← WALL TOP / SLAB BOTTOM (+17.25")
#4 rebar cont.
4" CONCRETE SLAB — 3000-4000 PSI
4" slab
edge
(concrete)
3" GRAVEL BASE
GRAVELBACKFILL3/4"
COMPACTEDFILL95% Proctor
4" perf. drain pipe
SLAB OVERHANG
1.5-2"
(past CMU face)
DRIP KERF
3/8" x 3/8"
3/4" from edge
L-bar #4 @ 24" o.c.
ties slab to wall
LED STEP LIGHT
Recessed in veneer, 12V
IP65+, 2700-3000K
~8-9" above yard grade
12AWG LV cable in gravel backfill
21.25" total
17.25" wall
← 4" slab
← 3" gravel
24" CMU
(3 crse)
6.75"
← 8" deep
← 24" wide →
YARD
Finished Grade
PATIO
House Level